Delivering an Open Data Center Ecosystem for AI

29.04.2026

Driving Innovations from Chip to Grid Across Hyperscale and Local Data Centers

BARCELONA, Spain, April 29, 2026 /PRNewswire/ -- The Open Compute Project Foundation (OCP), the nonprofit international organization bringing at-scale innovations and hyperscale best practices to all, today announced newly approved OCP contributions, new projects, and recently formed alliances to deliver on its Open Data Center Ecosystem for AI vision announced in October of 2025 covering IT as well as physical data center infrastructure and facilities.

Open Compute Project Foundation (OCP)

The newly approved OCP contributions include (1) a roadmap for open data center facilities for AI, Next Generation ML Infrastructure Design Principles, (2) an overview of proposed direct current power distribution architectures Data Center Facility - Low Voltage DC Power Distribution, (3) guidelines for safe design, operation, and maintenance of energy storage systems  Requirements for Energy Storage Systems used in Data Centers, (4) new methods for gathering telemetry to enable data center real time IT and OT management Third Party Integration, Telemetry & APIs, (5) using Ethernet for AI scale-up networking  ESUN - Network Operator Requirements, (6) a major expansion to the Open Rack ecosystem for AI with the Open Rack Wide (ORW) specification (7) new reference architectures for building AI Clusters Open Cluster Designs for AI White PaperOpen POD Group for M xPUs, and Open Cluster of N xPUs, and (8) developing open chiplet ecosystems with the Foundation Chiplet System Architecture.

"These OCP approved contributions address critical problems for AI data centers, several of which were highlighted in an open letter call for collaboration initiated by Google, Meta, and Microsoft last October. The OCP Community, OCP Foundation Team, and the OCP Board of Directors have been hard at work to overcome the challenges from chip to grid of deploying AI Clusters at scale. With no end in sight to the very large AI data center buildout, the collaborations and innovation standardizations within the OCP Community are more important than ever," said George Tchaparian, CEO at OCP.

To continue the collaborative work, recently launched projects and workstreams covering significant challenges still to be solved: (1) AI DC facilities: Open Data Center for AI and Data Center Facilities Power Distribution, (2) AI Clusters Connectivity: with Ethernet for Scale-Up Networking (ESUN), Scale-Up Ethernet Transport (SUE-T) and Optics Reliability, and (3) addressing the next wave of AI Inference: with the AI Computing Continuum.

Open Data Center for AI is focused on solving the most pressing challenges facing the deployment of at-scale AI data center facility infrastructure and operational technology (OT). This includes open data center reference designs, energy and grid solutions, telemetry and management solutions, and power estimation methodologies.

DCF Power Distribution aims to increase power density to enable next generation compute by enhancing energy efficiency and streamline power distribution, including the transition to Low Voltage Direct Current - LVDC (≤1500VDC) distribution architectures for the data center.

Scale-up Networking and Optics Reliability aims to advance Ethernet for scale-up domains in AI systems, re-examining how traffic is sent out across the network switches, including protocol headers, error handling, and lossless data transfer. Improving optics reliability with interoperability becomes critical because even a small failure rate across massive fabrics can cascade into significant interruptions, wasted accelerator hours, and degraded overall system utilization.

AI Computing Continuum aims to accelerate the adoption of scalable, interoperable, and sustainable AI systems beyond traditional hyperscale data centers by defining open, modular infrastructure standards that work across diverse hyperscale adjacent environments—including regional colocation, enterprise on premises, telco points of presence, and industrial sites.

We've also formed new alliances adding new dimensions to OCP's ecosystem with (1) the Electric Power Research Institute (EPRI)  and (2) the IOWN Global Forum.

EPRI and OCP aim to accelerate digital innovation and further develop the potential of data centers to serve as flexible resources for the power system.

Current/OS and OCP focused on data center power technology standards and best practices. The alliance between the two organizations will fuse OCP's expertise in open data center hardware with Current/OS's open standards for safe, interoperable direct current microgrids. This alliance aims to accelerate the shift from traditional AC-based power to efficient hybrid AC/DC or fully DC-native data center infrastructure.

IOWN Global Forum and OCP are working to deliver a seamless computational infrastructure from centralized to edge deployments. IOWN Global Forum and OCP will work together to develop a roadmap for a multi-site, high-bandwidth, low-latency compute and network infrastructure.

"The need for extreme integration and co-design when designing AI clusters has become an imperative in the push to have a significant performance increment in generation over generation infrastructure. The move by the OCP Foundation to expand its Community footprint to cover from chip to grid is in perfect sync with the market and an important focus to deliver innovations needed for next generation AI data centers," said Ashish Nadkarni, GVP/GM, Worldwide Enterprise Infrastructure at IDC.

About OCP

The Open Compute Project (OCP) brings at-scale innovations and hyperscaler best practices to all, spanning technology domains from the data center to the edge, and the technology stack from silicon, to systems, to site facilities and services. The international OCP Community is made up of organizations and people from hyperscale, neocloud and cloud data center operators, communications providers, colocation providers, diverse enterprises, and technology providers. With The OCP Tenets of Openness, Impact, Efficiency, Scale and Sustainability, the OCP Foundation engages with industry ecosystems, our growing membership, and educates thousands of engineers and industry leaders, every year. Across many projects and initiatives, the OCP Foundation and its Community are meeting the AI Data Center market evolution today and shaping the future. Learn more at: www.opencompute.org.

Media Contact

Dirk Van Slyke

Open Compute Project Foundation

dirkv@opencompute.org

Logo - https://mma.prnewswire.com/media/1018821/5942404/OCP_Logo.jpg

Cision View original content:https://www.prnewswire.co.uk/news-releases/delivering-an-open-data-center-ecosystem-for-ai-302756544.html

Other news

Kursaal Bern investiert in Technikpartner IDS Group und aktiviert neue immaterielle Werte

30.04.2026

Die Kursaal Bern AG hat im Geschäftsjahr 2025 in einem anspruchsvollen Umfeld weniger umgesetzt und verdient, hält aber an ihrer Dividendenpolitik fest. Der Verwaltungsrat will der Generalversammlung vom 6. Juni eine unveränderte Ausschüttung von 22 Franken pro Aktie vorschlagen. Der Betriebsertrag der Gruppe aus Gastronomie, Hotellerie, Casinos und Events sank um 2,5 Prozent auf 74,7 Millionen Franken. Das EBITDA ging auf 12,4 Millionen Franken zurück, was einem Rückgang von 5,3 Prozent entspricht, das anteilige Jahresergebnis fiel um 0,5 Millionen auf 3,7 Millionen Franken.

Trotz rückläufiger Kennzahlen verweist das Unternehmen auf eine weiterhin «sehr gute» EBITDA-Marge. Diese spiegle die Effekte eines strikten Kostenmanagements und von Prozessoptimierungen wider. Die Eigenkapitalquote erhöhte sich erneut und lag Ende 2025 bei 70,3 Prozent, ein Plus von 2,5 Prozentpunkten gegenüber dem Vorjahr. Gleichzeitig wurde die Belegschaft angepasst: Die Zahl der Vollzeitstellen verringerte sich um 15 auf 382.

Operativ stand das Jahr im Zeichen besonderer Belastungen. In der Stadt Bern führte die baubedingte Sperrung der Kornhausbrücke zu geringeren Frequenzen in der Gastronomie und drückte die Umsätze in den klassischen Betrieben. Zudem schwächte sich der Markt für terrestrische Casinos ab: Das Grand Casino Kursaal Bern und das Casino Neuenburg verzeichneten einen Rückgang des Bruttospielertrags. Gegengewichte setzten die digitalen Angebote – insbesondere das Onlinecasino 7melons.ch, das ein «erfreuliches Wachstum» erzielte – sowie das Hotelgeschäft, das im Swissôtel Kursaal Bern dank steigender durchschnittlicher Zimmerpreise und der Rolle als UEFA-Host-Hotel bei der Frauenfussball-Europameisterschaft zusätzliche Aufmerksamkeit erhielt.

Strategisch treibt die Gruppe die technologische und digitale Erneuerung voran. Ende 2025 wurde die Technikpartnerschaft an die IDS Group vergeben, zu der unter anderem Kilchenmann AG und auviso AG gehören. Im neuen Modell beteiligt sich die Kursaal Bern AG an den Investitionen in Audio- und Videotechnik; daraus resultierten neu aktivierte immaterielle Vermögenswerte in Höhe von 1,6 Millionen Franken. Parallel dazu forciert das Unternehmen die Digitalisierung interner Abläufe, um Kosten zu senken und die Produktivität zu erhöhen – bei gleichzeitiger Sensibilisierung für Risiken wie Cyberangriffe, Datenverluste und Reputationsschäden.

Für das laufende Jahr zeigt sich die Kursaal Bern AG verhalten zuversichtlich. Trotz geopolitischer Unsicherheiten rechnet die Gruppe mit moderatem Wachstum und will insbesondere das Eventgeschäft mit eigenen Formaten ausbauen, etwa gemeinsam mit dem Berner Kulturlokal Bierhübeli im Kultursaal Bern. Dagegen dürfte die Hotellerie laut Unternehmensangaben unter den unsicheren globalen Rahmenbedingungen leiden, weshalb mit Belastungen in diesem Segment gerechnet wird.